
Sydney's glass pool fence installation specialists. Frameless 12mm toughened glass, AS 1926.1 certified,. Compliance certificates arranged. Free measure and quote.
A quality glass pool fence installation begins before the first hole is drilled. We attend your Sydney property for a free measure and assess the pool coping material (concrete, sandstone, travertine, tile), the available width for spigot placement, and any corners or level changes that require custom solutions. We then prepare a detailed quote with spigot positions marked, gate location confirmed, and the exact panel configuration to achieve a clean frameless look.
On installation day our team uses diamond-core drill bits — sized precisely to 70mm to match the spigot diameter — to bore clean, round holes in the pool coping. Spigots are set in either epoxy adhesive or non-shrink cementitious grout depending on the coping material. After a minimum overnight cure, 12mm AS/NZS 2208 toughened glass panels are inserted into the spigots and the friction-fit rubber gaskets are tightened to hold the panels firmly at the correct height and alignment. The self-closing, self-latching gate is fitted last and tested to verify it closes and latches under its own spring tension in all positions.
We conduct a pre-handover compliance check against AS 1926.1-2012 — measuring the barrier height at multiple points, verifying the non-climbable zone on the external face, and confirming the gate latch sits at the required 1500mm height on the pool side. We then coordinate the accredited certifier inspection and attend if required to address any minor adjustments. Most of our Sydney installations pass the compliance inspection on the first visit.
12mm toughened glass with core-drilled stainless spigots..
Post-supported frameless glass. Economical for large perimeters,.
Precision 70mm core drilling into concrete, sandstone, travertine and tiled copings.
AS 1926.1-compliant spring-loaded gates. Self-closing, self-latching, correct latch height.
Pre-inspection check plus accredited certifier coordination for certificate of compliance.
Replacement of damaged or cracked glass panels. Same-day service available in Sydney.
Installation process, costs and compliance explained
Installation involves: (1) marking spigot positions on the coping at 1000–1100mm centres; (2) diamond-core drilling 70mm bores; (3) setting 316 stainless spigots in epoxy or grout and allowing overnight cure; (4) inserting 12mm toughened glass panels and fitting the self-closing gate. A 25m fence typically takes 1–2 days.
Glass pool fence installation starts for frameless, including 12mm toughened glass, 316 stainless spigots, self-closing gate and labour. Semi-frameless starts. Aluminium starts.
AS 1926.1-2012 requires pool barriers to be at least 1200mm high. The non-climbable zone of 900mm on the outside must be free of footholds. Gates must be self-closing, self-latching and open away from the pool.
A 20–30m frameless glass pool fence takes 1–2 days. Core drilling and spigot setting is day one, with glass panels and gate fitted after overnight cure on day two. Larger or complex sites may take longer.
Yes. The pool barrier must be inspected by a council inspector or accredited certifier who issues a certificate of compliance under the NSW Swimming Pools Act 1992. This is required when selling or leasing. We coordinate the certifier inspection as part of our service.
Contact Sydney's trusted fencing contractors and landscape designers
77 Garfield St
Wentworthville NSW 2145
75 644 310 547

Professional since 2016
No-obligation assessments across Sydney
Established local business
Full compliance and protection
Premium suppliers and warranties
Reliable project delivery
Best value for money
Contact us today for your free consultation and quote
Transform your Sydney property with expert fencing contractors and landscape designers