358 anti climb mesh and rail toppings installed across Penrith, built to AS 1725 in heights from 2.1m through to 3.6m.
Penrith carries an unusual mix of assets that need climb proof boundaries. There are trade and plant yards through the Dunheved and Kingswood industrial pockets, Endeavour Energy substations feeding the growth corridor, pump stations along the Nepean, large school and tertiary campuses at Kingswood and Werrington, and event infrastructure around the stadium precinct. Every one of them attracts after hours climbers, and none of them suits razor wire.
Anti climb fencing solves that with geometry rather than barbs. A 358 panel has 76.2mm x 12.7mm apertures formed from 4mm wire, so the opening is narrower than a boot toe and far too tight to slide in a bolt cutter jaw or a crowbar. Penrith runs go out at 2.1m, 2.4m, 3.0m and 3.6m to AS 1725, bolted to RHS posts with one way tamper proof fixings, galvanised or powder coated black.
If you need a Penrith perimeter secured, we measure the site free and set the whole scope out in one fixed written quote. Call 0492 879 796 to get on the install schedule.
Climb proof compounds for Penrith builders holding plant, formwork and copper on open lots across the release areas.
Substation and pump station cages built to asset owner specification with clear sight lines for camera coverage.
Long runs for Kingswood and Werrington campuses where students need visibility through the fence but not a way over it.
Anti climb rail or spike topping added to existing Penrith palisade and chain wire without replacing the whole fence.
Black, monument and green powder coat over galvanising for street facing Penrith boundaries that have to look tidy.
Cantilever sliders and double swing gates clad in matching 358 mesh, sized for truck and plant movements.
The aperture does the work. 358 mesh has 76.2mm x 12.7mm openings in 4mm wire, so no gap is wide enough for a finger, a toe cap or the jaws of a bolt cutter. A climber has nothing to hold and no leverage point, which is why the same panel used in correctional work now protects Penrith substations and site compounds.
Schools and childcare usually sit at 2.1m to 2.4m. Trade yards, storage and industrial boundaries around Dunheved and Kingswood are commonly 2.4m to 3.0m. Substations, water assets and high value plant compounds go to 3.0m or 3.6m. AS 1725 covers all of those heights and we build to it as standard.
Yes. Release area builders around Jordan Springs, Caddens and Glenmore Park use 358 panels for the long term compound line and then reuse them on the next stage. Panels bolt to driven or concreted posts and come off cleanly with the correct security key.
Often we can. Where the posts and footings are sound, a rotating anti climb rail, an angled extension arm or a spike topping fitted to the top of existing chain wire or palisade lifts the effective height and removes the grip point at the top rail.
A typical 2.4m commercial run of sixty to eighty metres takes two to three days once footings have cured, gates included. Larger utility compounds and campus perimeters are programmed in stages so the site stays secure overnight throughout the works.
Contact Sydney's trusted fencing contractors and landscape designers
77 Garfield St
Wentworthville NSW 2145
75 644 310 547

Professional since 2016
No-obligation assessments across Sydney
Established local business
Full compliance and protection
Premium suppliers and warranties
Reliable project delivery
Best value for money
Contact us today for your free consultation and quote
Transform your Sydney property with expert fencing contractors and landscape designers